Published:
First published in 1932 in Lenin Miscellany XX.
Printed from the original.
Source:
Lenin
Collected Works,
Progress Publishers,
1976,
Moscow,
Volume 45,
pages 157b-158a.
Translated: Yuri Sdobnikov
Transcription\Markup:
R. Cymbala
Public Domain:
Lenin Internet Archive
You may freely copy, distribute,
display and perform this work; as well as make derivative and
commercial works. Please credit “Marxists Internet
Archive” as your source.
Other Formats:
Text
• README
28.V.1921
Check up with the utmost precision:
how much work exactly has been done (what part has been finished);
how much material, rails, etc., foodstuffs, etc., has actually been transported to the spot; where they are; the conditions in which all these materials and the delivered •things are stored; the conditions and the concrete possibilities of returning all these materials, rails and all the rest, without losses, without stealing, or with minimum losses; the proportion of the possible and probable losses;
it is the most important task to carry out this on-thespot assessment circumstantially and to verify it precisely.
With this problem solved, with the exact data in hand, a conclusion should be drawn up on the substance of the matter: is the “Algemba” construction to be stopped (if yes, how? by what date? etc.) or not to be stopped? and so on, and so forth.
V. Ulyanov (Lenin)
Chairman, C.L.D.
[1] On May 11, 1921, the Council of Labour and Defence approved Lenin’s draft assignments to the commission to check up on railway construction in the Emba area.
| | | | | |